Build Reason for deepin:CI:linuxdeepin:dde-calendar:PR-257 / dde-calendar
Repository / Architecture: deepin_develop / aarch64
Build reason:
meta change
Build scheduled at:
2026-01-13 14:13
2 packages that got changed and scheduled a build for package dde-calendar.
| Package | Change |
|---|---|
| libdtk6widget | md5sum |
| libdtk6widget-dev | md5sum |