Build Reason for deepin:CI:linuxdeepin:dde-calendar:PR-199 / dde-calendar
Repository / Architecture: deepin_develop / aarch64
Build reason:
meta change
Build scheduled at:
2024-11-30 04:09
2 packages that got changed and scheduled a build for package dde-calendar.
Package | Change |
---|---|
libdtkgui-dev | md5sum |
libdtkgui5 | md5sum |